home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V15_0 / V15NO076.TXT < prev    next >
Internet Message Format  |  1993-07-13  |  32KB

  1. Date: Thu,  6 Aug 92 05:03:00    
  2. From: Space Digest maintainer <digests@isu.isunet.edu>
  3. Reply-To: Space-request@isu.isunet.edu
  4. Subject: Space Digest V15 #076
  5. To: Space Digest Readers
  6. Precedence: bulk
  7.  
  8.  
  9. Space Digest                Thu,  6 Aug 92       Volume 15 : Issue 076
  10.  
  11. Today's Topics:
  12.               ACRV Mission Requirements, and Commentary
  13.                       Magellan Update - 08/05/92
  14.                    Meteor Soaks Datona FL (2 msgs)
  15.                               NASA Tools
  16.                    Origin of Life article (2 msgs)
  17.                         Question about tether
  18.                         Soyuz as ACRV (3 msgs)
  19.      Soyuz as ACRV (Posting of previous discussion data) (2 msgs)
  20.            TSS update (from Tuesday night press conference)
  21.                             What is FRED?
  22.        Whats wrong with this CIRCUIT (was: Tethered Satellites)
  23.  
  24.     Welcome to the Space Digest!!  Please send your messages to
  25.     "space@isu.isunet.edu", and (un)subscription requests of the form
  26.     "Subscribe Space <your name>" to one of these addresses: listserv@uga
  27.     (BITNET), rice::boyle (SPAN/NSInet), utadnx::utspan::rice::boyle
  28.     (THENET), or space-REQUEST@isu.isunet.edu (Internet).
  29. ----------------------------------------------------------------------
  30.  
  31. Date: 5 Aug 92 13:52:20 EDT
  32. From: "John F. Woods" <jfw@ksr.com>
  33. Subject: ACRV Mission Requirements, and Commentary
  34. Newsgroups: sci.space
  35.  
  36. Wales.Larrison@ofa123.fidonet.org writes:
  37. >     Again, I have a problem with this requirement.  If there was
  38. > another Challenger-type problem, they would launch anyway to reach
  39. > stranded folks on SSF.  Just launch when it was warm....
  40.  
  41. Actually, it is conceivable that there can exist problems that would ground
  42. the shuttle fleet for more than 3 months, even without an actual disaster:
  43. if a vital component that gets replaced every mission turned out to have a
  44. manufacturing defect, and if all of the in-stock replacements had the same
  45. defect, then you'd be looking at a delay equal to the time to analyze and
  46. correct the problem plus the usual lead time for that part.  As I recall,
  47. there was a bad batch of teflon seals that ended up slipping one mission
  48. (though presumably seals aren't a long lead-time item, the diagnosis took
  49. some time).  Perhaps someone at NASA can comment on what parts might be the
  50. worst-case for such a scenario?
  51.  
  52. And while we're on the topic, did NASA ever get a budget for a truly complete
  53. set of spare parts, or are they still cannibalizing Orbiters to support each
  54. current mission?
  55.  
  56. ------------------------------
  57.  
  58. Date: 6 Aug 92 02:34:09 GMT
  59. From: Ron Baalke <baalke@kelvin.jpl.nasa.gov>
  60. Subject: Magellan Update - 08/05/92
  61. Newsgroups: sci.space,sci.astro
  62.  
  63. Forwarded from:
  64. PUBLIC INFORMATION OFFICE
  65. JET PROPULSION LABORATORY
  66. CALIFORNIA INSTITUTE OF TECHNOLOGY
  67. NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
  68. PASADENA, CALIF. 91109. TELEPHONE (818) 354-5011
  69.  
  70.                      MAGELLAN STATUS REPORT
  71.                          August 5, 1992
  72.  
  73.      Two tests were conducted on Magellan's transmitter B last
  74. week at its minimum temperature of 23.4 C (74 F) to see if high
  75. rate data could be received.  Both tests showed a continuing
  76. noise spur at various temperatures which has prevented the
  77. transmission back to Earth of mapping data with transmitter B in
  78. the low temperature mode.  The alternate transmitter, A, failed
  79. last January.
  80.  
  81.      It was thought that turning the transmitter off and
  82. permitting it to cool until needed would prevent the noise spur
  83. from occurring.  Since it was not successful, controllers said,
  84. the project will return to the mode of leaving the transmitter on
  85. when it resumes testing on August 21.  That command sequence,
  86. which runs until September 3, will be a dress rehearsal and high
  87. temperature stabilization period for the next sequence, September
  88. 3 to 14, designed to map the last significant coverage gap, about
  89. 1.5 percent, in the global map of Venus.
  90.  
  91.      In the meantime, transmitter B has been turned off and daily
  92. operations have been resumed on transmitter A which can be used
  93. for gravity and engineering data.  The orbit adjustment burn to
  94. reduce periapsis altitude to 182.5 kilometers (113.15 miles) is
  95. still planned for September 14, marking the beginning of cycle 4.
  96. That cycle will be dedicated to global gravity data with some
  97. targeted mapping.  Both transmitters can be used for gravity
  98. mission operations, but only transmitter B can be used for
  99. mapping.
  100.                      -------------
  101.      ___    _____     ___
  102.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  103.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  104.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | You can't hide broccoli in
  105. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | a glass of milk - 
  106. |_____|/  |_|/       |_____|/                     | anonymous 7-year old.
  107.  
  108. ------------------------------
  109.  
  110. Date: 5 Aug 92 17:47:47 GMT
  111. From: FRANK NEY <tnc!m0102>
  112. Subject: Meteor Soaks Datona FL
  113. Newsgroups: sci.space
  114.  
  115. -----I quote-----
  116. A giant wave that drenched Datona FL and caused a lot of damage
  117. in July turns out to have probably been caused by a 1 meter 
  118. meteor!  
  119.  
  120. I wonder if this'll give the beancounters in Congress any 
  121. incentive to fund a near-Earth Asteroid finder program.  
  122. True, not many 1 m objects can be found, but perhaps this can
  123. scare them enough to look for big ones on the way to turn DC
  124. into a crater :-)
  125. -----end quote------
  126.  
  127. There was a SF story like that written in the early '70s where the
  128. world was held on the brink of nuclear war when a 100m rock nailed the
  129. 'zero milestone.'  Only the self-restraint of the general officer on
  130. duty prevented a double catastrophe.
  131.  
  132. Seriously though, don't look for NASA or congress to do anything
  133. unless they think something is in it for them.  Altruism doesn't cut
  134. it.
  135.  
  136. Now, if we had private concerns in space (not bloody likely
  137. considering the Commercial Space Lauch Act, which is not) we could
  138. appeal to the profit motive.  Gee, all these rocks that come
  139. conveniently close to earth, ready to be mined..........
  140.  
  141. Frank Ney N4ZHG EMT-P  LPVa NRA ILA GOA CCRTKBA "M-O-U-S-E"
  142. Commandant and Acting President, Northern Virginia Free Militia
  143. Send e-mail for an application and more information
  144. ----------------------------------------------------------------
  145. "...I am opposed to all attempts to license or restrict the arming of
  146. individuals...I consider such laws a violation of civil liberty, 
  147. subversive of democratic political institutions, and self-defeating
  148. in their purpose."
  149.         - Robert Heinlein, in a 1949 letter concerning "Red Planet"
  150. -- 
  151. The Next Challenge - Public Access Unix in Northern Va. - Washington D.C.
  152. 703-803-0391 To log in for trial and account info.
  153.  
  154. ------------------------------
  155.  
  156. Date: Wed, 5 Aug 1992 18:44:53 GMT
  157. From: Greg F Walz Chojnacki <gwc@csd4.csd.uwm.edu>
  158. Subject: Meteor Soaks Datona FL
  159. Newsgroups: sci.space
  160.  
  161. From article <1502@tnc.UUCP>, by m0102@tnc.UUCP (FRANK NEY):
  162. > -----I quote-----
  163. > A giant wave that drenched Datona FL and caused a lot of damage
  164. > in July turns out to have probably been caused by a 1 meter 
  165. > meteor!  
  166. >  
  167. IS there any source on this <alleged> meteor event other than a TV news report?
  168.  
  169. Greg
  170.  
  171. ------------------------------
  172.  
  173. Date: 5 Aug 92 12:53:48 GMT
  174. From: John Roberts <roberts@CMR.NCSL.NIST.GOV>
  175. Subject: NASA Tools
  176. Newsgroups: sci.space
  177.  
  178. -From: Bruce_Dunn@mindlink.bc.ca (Bruce Dunn)
  179. -Subject: NASA Tools
  180. -Date: 5 Aug 92 00:27:47 GMT
  181. -Organization: MIND LINK! - British Columbia, Canada
  182.  
  183. -> John Roberts writes:
  184. -> No release of the TSS yet - it appears to be stuck.
  185. -> 
  186. -> Maybe they need to unpack the Ferrous Portable Leverage Application
  187. -> Mechanism (FPLM), the Passive Maximal Kinetic Transfer Device (PMKTD),
  188. -> and the Linear Metallic Abrasive System (LMAS), and try an EVA. :-)
  189.  
  190. -Crowbar, hammer, and file?
  191.  
  192. Very good! :-)  What I specifically had in mind was crowbar, sledgehammer,
  193. hacksaw. That LMAS acronym needs work - I agree it's ambiguous.
  194.  
  195. The Shuttle has all sorts of nifty tools stowed away, that they never take out
  196. unless they really need them. I don't know if they have a sledgehammer, but
  197. I'm sure they have a hammer of some kind. To the above tools, add pliers,
  198. a couple of screwdrivers, an adjustable wrench, and some grey tape (duct tape),
  199. and you've got all the basic tools to demolish, er, repair just about anything.
  200. For the ultimate in luxury, throw in an electric drill, grinder, tin snips, and
  201. pop rivet tool. Plus assorted nuts, bolts, washers, and screws, of course.
  202.  
  203. The initial problem was that the power (/communications?) umbilical to the
  204. Shuttle failed to unplug - it appears they finally got the actuator working.
  205.  
  206. John Roberts
  207. roberts@cmr.ncsl.nist.gov
  208.  
  209. ------------------------------
  210.  
  211. Date: Wed, 5 Aug 1992 18:35:41 GMT
  212. From: greg@skatter.usask.ca
  213. Subject: Origin of Life article
  214. Newsgroups: sci.space
  215.  
  216. From article <1992Aug05.163028.91421@cs.cmu.edu>, by stroxel@cvgs.schools.Virginia.EDU (Steve Troxel):
  217. > Why is it so difficult for people who call themselves
  218. > scientists to explore the possibility that God created the
  219. > earth and all the creatures on it?  There is every bit as much
  220. > scientific "proof" for the "theory" of creation as there is for
  221. > the "theory" of evolution.  Why is everyone so set against
  222. > acknowledging a valid alternative hypothesis?  Is there some
  223. > prejudice against is?
  224. > Steve Troxel
  225. > stroxel@cvgs.schools.Virginia.EDU
  226. > **Save the baby humans.**
  227.  
  228. Perhaps because of all the hard physical evidence for evolution,
  229. and the total lack of the same for creation.  Scientists work
  230. with facts, and theories that fit them.  Hypotheses die when
  231. not supported by evidence.
  232.  
  233. Greg Retzlaff
  234. Saskatchewan Accelerator Laboratory
  235.  
  236. ------------------------------
  237.  
  238. Date: Wed, 5 Aug 1992 18:37:14 GMT
  239. From: Henry Spencer <henry@zoo.toronto.edu>
  240. Subject: Origin of Life article
  241. Newsgroups: sci.space
  242.  
  243. In article <1992Aug05.163028.91421@cs.cmu.edu> stroxel@cvgs.schools.Virginia.EDU (Steve Troxel) writes:
  244. >Why is it so difficult for people who call themselves
  245. >scientists to explore the possibility that God created the
  246. >earth and all the creatures on it? ...
  247.  
  248. This has gotten somewhat peripheral to sci.space already, and *this* new
  249. digression puts it over the edge.  Take it to talk.origins, please.
  250. -- 
  251. There is nothing wrong with making      | Henry Spencer @ U of Toronto Zoology
  252. mistakes, but... make *new* ones. -D.Sim|  henry@zoo.toronto.edu  utzoo!henry
  253.  
  254. ------------------------------
  255.  
  256. Date: 5 Aug 92 17:39:18 GMT
  257. From: Desiree Bradley <Desiree_Bradley@mindlink.bc.ca>
  258. Subject: Question about tether
  259. Newsgroups: sci.space
  260.  
  261. Thinking about the Northern Lights (aurora borealis) and the aurora australis
  262. (near the South Pole), I was wondering if during polar winters it would be
  263. advisable to not let down the tether anywhere near polar regions.  However, I
  264. don't know enough to say anything about the tether and any possible effects the
  265. auroras could have on the electricity flow in the tether.
  266.  
  267. Did somebody a while back post a message that would answer my question?  Also,
  268. is there a good journal article (not at Ph.D. level, please) that would explain
  269. the tether and answer my question about possible effects of auroras?  Perhaps
  270. somebody could E-Mail the bibliographic reference (title of journal, issue date
  271. - or volume+number).  With that much information I could find the rest.
  272.  
  273. Thanks.
  274.  
  275. Desiree Bradley
  276.  
  277. ------------------------------
  278.  
  279. Date: Wed, 5 Aug 1992 17:33:27 GMT
  280. From: "Allen W. Sherzer" <aws@iti.org>
  281. Subject: Soyuz as ACRV
  282. Newsgroups: sci.space
  283.  
  284. In article <1992Aug5.164731.20224@news.acns.nwu.edu> lentz@reber.astro.nwu.edu (Robert A. Lentz) writes:
  285.  
  286. >Have the concerns for polluting the environment surrounding the station
  287. >been removed? If not then would not a lot of this on-orbit processing, and
  288. >the frequent Soyuz flights do much to polluting the environment?
  289.  
  290. Since Soyuz weighs a good deal less than Shuttle it should burn far less
  291. fuel. Polution should therefore be lower.
  292.  
  293. >And the frequent soyuz flights would still put a cap on the duration of
  294. >some of the microgravity experiments.
  295.  
  296. Soyuz flights wold be no more frequent than Shuttle flights. 
  297.  
  298. >And last I knew, the proposal still called for refurbishment by swapping
  299. >modules as the shuttle carried them up. I have heard how they would be
  300. >carried up on the HLV Delta, but how would they be returned?
  301.  
  302. I envision a reusable logistics module. It is brought back using a teather
  303. and parachute (or a small kick motor). It goes up on HL Delta and comes
  304. down in the logistics module.
  305.  
  306.     Allen
  307.  
  308. -- 
  309. +---------------------------------------------------------------------------+
  310. | Allen W. Sherzer | "If they can put a man on the Moon, why can't they     |
  311. |  aws@iti.org     |  put a man on the Moon?"                               |
  312. +----------------------261 DAYS TO FIRST FLIGHT OF DCX----------------------+
  313.  
  314. ------------------------------
  315.  
  316. Date: Wed, 05 Aug 92 18:42:30 GMT
  317. From: Doug Mohney <sysmgr@king.eng.umd.edu>
  318. Subject: Soyuz as ACRV
  319. Newsgroups: sci.space
  320.  
  321. In article <1992Aug5.173327.2154@iti.org>, aws@iti.org (Allen W. Sherzer) writes:
  322. >In article <1992Aug5.164731.20224@news.acns.nwu.edu> lentz@reber.astro.nwu.edu (Robert A. Lentz) writes:
  323. >
  324. >>Have the concerns for polluting the environment surrounding the station
  325. >>been removed? If not then would not a lot of this on-orbit processing, and
  326. >>the frequent Soyuz flights do much to polluting the environment?
  327. >
  328. >Since Soyuz weighs a good deal less than Shuttle it should burn far less
  329. >fuel. Polution should therefore be lower.
  330.  
  331. Oh. You left out resupply flights. Hm. You'd better go back to the drawing
  332. board and add those up.
  333.  
  334. >>And the frequent soyuz flights would still put a cap on the duration of
  335. >>some of the microgravity experiments.
  336. >
  337. >Soyuz flights wold be no more frequent than Shuttle flights. 
  338.  
  339. Oh. Neet. Resupply occurs by magik. Nifty. Oh. or HLV Delta flights. But, like
  340. sand, it slips out of your overall fiction, er picture.
  341.  
  342.  
  343.                  Support U.N. military force against Serbia
  344.  
  345.   -- >                  SYSMGR@CADLAB.ENG.UMD.EDU                        < --
  346.  
  347. ------------------------------
  348.  
  349. Date: Wed, 5 Aug 1992 19:55:38 GMT
  350. From: "Allen W. Sherzer" <aws@iti.org>
  351. Subject: Soyuz as ACRV
  352. Newsgroups: sci.space
  353.  
  354. In article <1992Aug05.184230.6910@eng.umd.edu> sysmgr@king.eng.umd.edu writes:
  355.  
  356. >>Since Soyuz weighs a good deal less than Shuttle it should burn far less
  357. >>fuel. Polution should therefore be lower.
  358.  
  359. >Oh. You left out resupply flights. Hm. You'd better go back to the drawing
  360. >board and add those up.
  361.  
  362. OK. Since Soyuz and the resuply modules weigh less than the equivalent
  363. Shuttle flights, polution should be lower.
  364.  
  365. Polution is furthur reduced since logistic modules are teathered down
  366. which means both fewer burns for logistics AND fewer burns for Freedom
  367. stationkeeping. This also saves additional $$ since less fuel is needed.
  368.  
  369. How's that?
  370.  
  371.    Allen
  372. -- 
  373. +---------------------------------------------------------------------------+
  374. | Allen W. Sherzer | "If they can put a man on the Moon, why can't they     |
  375. |  aws@iti.org     |  put a man on the Moon?"                               |
  376. +----------------------261 DAYS TO FIRST FLIGHT OF DCX----------------------+
  377.  
  378. ------------------------------
  379.  
  380. Date: Wed, 5 Aug 1992 17:13:45 GMT
  381. From: Mark Littlefield <mll@aio.jsc.nasa.gov>
  382. Subject: Soyuz as ACRV (Posting of previous discussion data)
  383. Newsgroups: sci.space
  384.  
  385. In article <1992Aug5.120813.9376@iti.org>, aws@iti.org (Allen W. Sherzer) writes:
  386. |> In article <n0666t@ofa123.fidonet.org> Wales.Larrison@ofa123.fidonet.org writes:
  387. |> >Allen and I did a significant thrash of this topic in January on
  388. |> >talk.politics.space....
  389. |> 
  390. |> I'm deleting most of this and just want to comment on a few points.
  391. |> 
  392. |> >   However, we still haven't resolved the issue of return cargos.
  393. |> >To return 80,000 lbs per year is not trivial. 
  394. |> 
  395. |> Since January I have spoken with an engineer who works on Freedom. He says
  396. |> that very little will be brought back and that the biggest single object
  397. |> is a stationkeeping engine which weighs about 15K pounds. Aside from that
  398. |> vast majority of what will be returned is trash which we can simply teather
  399. |> down and let it burn up. It sounds like Dale's comment about putting the
  400. |> stuff in a shoe box is about right.
  401.  
  402. Like so many of Allen's postings, this one suffers from selective
  403. blindness (is that flame-bate or what ;-).  True, the single largest
  404. object to be returned from Freedom is a station keeping engine pallet.
  405. However, the engine pallets are not the only massive objects to be
  406. returned (besides, sets of two pallets are changed out and returned at
  407. one time, doubling the mass).  Experiment racks are returned during
  408. each utility flight and are refurbished and re-used.  Also, the
  409. logistics modules are returned and re-used on many of these flights.
  410.  
  411. Now, granted, you could simply destroy all of these by dumping them
  412. overboard, building new ones, and launching them on expendables and
  413. probably do it cheaper than using the shuttle to launch, recover, and
  414. re-launch.  HOWEVER, the shuttle will also be performing crew
  415. rotations at that time (1 to 2 more launches), the shuttle provides
  416. support for Freedom while on station (shuttle RMS is used along with
  417. SSRMS, shuttle is available for crew and equipment retrieval, etc)
  418. PLUS, the shuttle provides a low-G return capability that is not
  419. available on your "slapping some Shuttle tiles on a logistics 
  420. module and adding a parachute" scheme.
  421.  
  422. Next, watch for Allen to pull some more numbers out of his hat to show
  423. that you could actually get a fully functional moonbase from materials
  424. bought at K-mart and have change left over for a movie.....
  425.  
  426. -- 
  427. =====================================================================
  428. Mark L. Littlefield              Intelligent Systems Department
  429. internet: mll@aio.jsc.nasa.gov 
  430. USsnail:  Lockheed Engineering and Sciences 
  431.           2400 Nasa Rd 1 / MC C-19            
  432.           Houston, TX 77058-3711
  433. ====================================================================
  434.  
  435. ------------------------------
  436.  
  437. Date: Wed, 5 Aug 1992 18:16:45 GMT
  438. From: "Allen W. Sherzer" <aws@iti.org>
  439. Subject: Soyuz as ACRV (Posting of previous discussion data)
  440. Newsgroups: sci.space
  441.  
  442. In article <1992Aug5.171345.24549@aio.jsc.nasa.gov> mll@aio.jsc.nasa.gov writes:
  443.  
  444. >Like so many of Allen's postings, this one suffers from selective
  445. >blindness (is that flame-bate or what ;-).  
  446.  
  447. Since it is obviously not true, I'll simply ignore it. :-)
  448.  
  449. In case I have missed something, I have doubled the cost of everything. If
  450. you want, we can triple the cost of everything and STILL save $2 billion
  451. per year.
  452.  
  453. >True, the single largest
  454. >object to be returned from Freedom is a station keeping engine pallet.
  455. >However, the engine pallets are not the only massive objects to be
  456. >returned (besides, sets of two pallets are changed out and returned at
  457. >one time, doubling the mass).  
  458.  
  459. As long as it fits into the logistics module. Since I propose to use
  460. the same one going down as up, it should fit OK.
  461.  
  462. >Now, granted, you could simply destroy all of these by dumping them
  463. >overboard, building new ones, and launching them on expendables and
  464. >probably do it cheaper than using the shuttle to launch, recover, and
  465. >re-launch.  
  466.  
  467. Well then that's what you should do. Only NASA could make wasting money
  468. a virtue.
  469.  
  470. >HOWEVER, the shuttle will also be performing crew
  471. >rotations at that time (1 to 2 more launches), 
  472.                         ^^^^^^^^^^^^^^^^^^^^^^^
  473. I don't understand what you mean here.
  474.  
  475. If somebody else can provide the same service for half the cost then I
  476. don't care what the Shuttle does.
  477.  
  478. >the shuttle provides
  479. >support for Freedom while on station (shuttle RMS is used along with
  480. >SSRMS, shuttle is available for crew and equipment retrieval, etc)
  481.  
  482. Is this capability worth the billions it costs? for a fraction of this
  483. cost we could add an extra arm to Freedom and have it available ALL the
  484. time.
  485.  
  486. >PLUS, the shuttle provides a low-G return capability that is not
  487. >available on your "slapping some Shuttle tiles on a logistics 
  488. >module and adding a parachute" scheme.
  489.  
  490. How do you know? We can base it on the DC-Y vehicle without the engines,
  491. tanks, ect. Such a vehicle would be reusable with very little if any
  492. maintenance. Offer significant crossrange capability AND return with
  493. lower Gs than Shuttle.
  494.  
  495. >Next, watch for Allen to pull some more numbers out of his hat to show
  496. >that you could actually get a fully functional moonbase from materials
  497. >bought at K-mart and have change left over for a movie.....
  498.  
  499. Which numbers do you think I have pulled out of my hat? All my launch
  500. costs are list prices generally available today. HLV costs are based
  501. on offers made to the government.
  502.  
  503. As to K-mart and the moon base, I'll bet I could find a lot of stuff
  504. there which would work just fine on the moon. Maybe not but until you
  505. look with an open mind, you will never know.
  506.  
  507.   Allen
  508.  
  509. -- 
  510. +---------------------------------------------------------------------------+
  511. | Allen W. Sherzer | "If they can put a man on the Moon, why can't they     |
  512. |  aws@iti.org     |  put a man on the Moon?"                               |
  513. +----------------------261 DAYS TO FIRST FLIGHT OF DCX----------------------+
  514.  
  515. ------------------------------
  516.  
  517. Date: 5 Aug 92 13:50:49 GMT
  518. From: John Roberts <roberts@CMR.NCSL.NIST.GOV>
  519. Subject: TSS update (from Tuesday night press conference)
  520. Newsgroups: sci.space
  521.  
  522. -From: roberts@CMR.NCSL.NIST.GOV (John Roberts)
  523. -Subject: Another TSS update
  524. -Date: 5 Aug 92 05:04:39 GMT
  525.  
  526. -I got most of the post-midnight press conference on videotape. It's too
  527. -much to type in at 1 AM. Maybe in the morning I can post some of the
  528. -highlights (and of course we can hope for official releases from the
  529. -NASA people).
  530.  
  531. -Basically, it got stuck several times, and didn't deploy as far as planned
  532. -for the first day. It's thought that the main problem at the moment is
  533. -that high tension in the earlier maneuvers has caused some of the loops of
  534. -tether on the reel to slip down beneath the outer layer of loops, causing
  535. -them to have much higher friction in deployment. There's considerable
  536. -hope that getting a "running start" and deploying faster than originally 
  537. -planned will get them past the points where it sticks.
  538.  
  539. -There's still some hope for a deployment of the originally planned length,
  540. -but consumables on the satellite are a concern. The mission has been extended
  541. -one day to increase the amount they can accomplish. Currently the satellite
  542. -is in a stable mode 870 feet from the Shuttle, with minimum power consumption.
  543. -All the scientific instruments appear to be working correctly. The Shuttle
  544. -team that works with the tether has gone to bed, and they plan to get up
  545. -in seven hours and continue work.
  546.  
  547. Additional notes:
  548.  
  549.  - Initial cause of umbilical disconnect failure was probably moisture.
  550.    They did a "soak" in sunlight to heat the mechanism, and it worked.
  551.  
  552.  - The running start method has already been successful at least once.
  553.    It is expected that it will be needed several times, probably at intervals
  554.    of several hundred meters. They think they can get it "as far as needed".
  555.    18-20 km may be practical.
  556.  
  557.  - All the scientific instruments have been successfully activated.
  558.    The cargo bay electron guns have been fired.
  559.  
  560.  - They probably will not be able to have the full set of scientific
  561.    instruments activated until they get up to 6 km, and during retrieval 
  562.    after it gets closer than 6 km, due to battery constraints. (Some of the
  563.    power has already been used.)
  564.  
  565.  - 20kg of nitrogen remaining - ~60% has been used so far. With 20km deploy,
  566.    expect to need ~12kg of nitrogen.
  567.  
  568.  - Stops at a few cm and at 180m are thought to be related. Deploying the
  569.    boom may have been what pulled the tether tight enough to jam up the loops
  570.    of tether on the spool. It may be a specific point along the length of
  571.    the spool that has the problem. Next expected stick point if this assumption
  572.    is valid is 1000-1100 meters. Increasing the rate of deploy is expected
  573.    to help.
  574.  
  575.  - They stopped for the night instead of letting the other crew shift continue
  576.    operations because it's a very complex activity, and just the one crew has
  577.    received TSS training.
  578.  
  579.  - Minimum deploy for fully satisfactory results would be 10 km.
  580.  
  581.  - The satellite flies very well, and the dynamic interaction between the
  582.    satellite and the Shuttle has been easy to control. (It remained stable
  583.    overnight.)
  584.  
  585.  - The satellite battery has a capacity of 9000 watt-hours. A delay of 24
  586.    hours would still have allowed nominal energy for the whole mission.
  587.  
  588.  - Beyond 1200 meters, the gravity-gradient pull should be sufficient to
  589.    help considerably with the deployment. 
  590.  
  591.  - Tentative schedule: Resume deploy ~10AM EDT Wednesday. ~6 hours for
  592.    deploy to 12.5 miles (3:30 PM EDT). 8 hours science mission at full
  593.    deploy, ending at 11:30 PM EDT. Retrieval sequence - 6.5 hours for
  594.    first stage, ending at 6AM EDT Thursday, final phase 4.5 hours, until
  595.    10:30 AM EDT, then dock to boom at 12:30 PM EDT Thursday. (There may
  596.    have been a half hour slip thus far.) About a day later, lower orbit to
  597.    128 nautical mile orbit, to support the other experiments. Landing on 
  598.    Saturday morning.
  599.  
  600.  - Wednesday morning - they've just reeled in 88.5 feet of tether. It's
  601.    hoped that unreeling over that distance will get speed up to about
  602.    2 feet per second before it reaches the 850 foot stick point.
  603.  
  604. Comments: It would be nice if there were provisions to use some of the 
  605. tether-generated power to recharge the satellite batteries. It also appears
  606. that it might be a good idea to develop some sort of "tension regulator"
  607. (analogous to a SCUBA pressure regulator) to go between the tether reel and
  608. the satellite, so the tension on the reel is never allowed to go above a 
  609. certain level. Tension should also be carefully regulated in the initial
  610. winding of the spool, and on rewind. I'm sure they took this into account on
  611. this mission, but perhaps they didn't do enough. :-)
  612.  
  613. John Roberts
  614. roberts@cmr.ncsl.nist.gov
  615.  
  616. ------------------------------
  617.  
  618. Date: Wed, 5 Aug 1992 16:55:10 GMT
  619. From: "Robert A. Lentz" <lentz@reber.astro.nwu.edu>
  620. Subject: What is FRED?
  621. Newsgroups: sci.space
  622.  
  623. In article <9208050511.AA16025@cmr.ncsl.nist.gov> roberts@CMR.NCSL.NIST.GOV (John Roberts) writes:
  624. >
  625. >-From: henry@zoo.toronto.edu (Henry Spencer)
  626. >-Subject: Re: What is FRED??
  627. >-Date: 4 Aug 92 22:34:02 GMT
  628. >
  629. >-In article <1992Aug4.215355.8158@den.mmc.com> zwork@starfighter.den.mmc.com (Michael Corvin) writes:
  630. >->What program does "fred" refer to?  I've seen it mentioned quite
  631. >->a bit but have never come across what it actually is...
  632. >
  633. >-It's a cynical nickname for Space Station Freedom, coined when the thing
  634.  
  635. >-shrunk yet again a couple of years ago.
  636. >
  637. >Actually, somebody on sci.space suggested "Fred" even before Reagan announced
  638. >the name "Freedom".
  639.  
  640. As I recall it was proposed back during a discussion about naming the new
  641. shuttle. It was pointed out that we have Atlantis, Colubia, and Discovery,
  642. so the new shuttle name should begin with a "B". Someone then suggested the
  643. pair of Fred and Barney for the station and shuttle. Someone else suggested
  644. Darwin' ship "Beagle", commenting that it sort of even looks like one :-)
  645.  
  646. As I like telling my friends, the station started out as "Freedom", and
  647. through the cutbacks/redesigns is now "Fred", and anymore cutbacks will
  648. make it "dead".
  649.  
  650. -Robert
  651. --
  652. r-lentz@nwu.edu      "We're a rock-and-roll band and we'll bring down the house
  653.                    the way Bill is going to bring down the country."
  654.                        -Roger Clinton, on his band's plans to play at the
  655.                         Inauguration if his half brother, Bill, wins.
  656.  
  657. ------------------------------
  658.  
  659. Date: 5 Aug 92 18:57:22 GMT
  660. From: "John W. Cobb" <johncobb@ut-emx.cc.utexas.edu>
  661. Subject: Whats wrong with this CIRCUIT (was: Tethered Satellites)
  662. Newsgroups: sci.physics,sci.space
  663.  
  664. I'm cross-posting to sci.space. Scott said that they were having a
  665. similar discussion. I haven't been keeping track there. I hope this
  666. is a help and not a hindrance there.
  667.  
  668. In article <l7ukasINNaem@pollux.usc.edu>, srobiner@pollux.usc.edu
  669. (Steven Robiner) writes:
  670. |>
  671. |>Excuse me, but isn't something missing from this "Tethered Satellite"
  672. |>experiment?  The shuttle is at one end, and the satellite is at the 
  673. |>other, right?  But that's an open circuit, so where's the load
  674. |>joining the ends of this 'generator.'?
  675. |>
  676.  
  677. Why should this bother you anymore than seeing something like:
  678.                     -----------|
  679.  
  680.                              -----
  681.                               ---
  682.                                -
  683. On a circuit diagram? Where's the load for a grounded circuit?
  684. How do you get a power supply that guarentees you the input is at
  685. +9V?
  686.  
  687. The difference here is that we appeal to a novel source of EMF rather
  688. than something more standard like a battery or a power supply.
  689.  
  690. Now if you want to get to the nitty gritty, you should ask, well lets
  691. follow the electrons and see what happens. So lets try that. The tether
  692. will soak up electrons (I'm assuming a polarity here, I may have it reversed)
  693. then transports it to the shuttle. Since the shuttle will have an excess
  694. of electrons, it will shed them when its potential compared to the
  695. local plasma is higher than the work function for the shuttle surfaces.
  696. So now you have the "infused" electrons into the flux tube that contains
  697. the shuttle. Eventually normal plasma-plasma and plasma-neutral interactions
  698. will allow the electron to move back to its original flux tube. This however
  699. may take some time. So the circuit is really completed in the same sense
  700. that grounded circuits are completed, except here we don't have a good ground
  701. because of magnetic insulation. The critical question becomes, what is
  702. the maximum current I can pull off of this circuit. That is the voltage is
  703. fixed, so the power output depends on the maximum current. Well if you
  704. pull enough current fast enough, you will create a charge imbalance between
  705. the flux-tubes and shut down the circuit. Two things will determine this
  706. limit. The first is the relaxation time mentioned above and the second is
  707. the motion of the shuttle itself. The shuttle is moving across the magnetic
  708. field, so if it saturates the local flux-tube with excess electrons then
  709. it cannot draw extra current until its orbital motion takes it to another
  710. flux tube. Now I am not sure whether natural relaxation time or orbital
  711. motion sets the limit on power extracted.
  712.  
  713. Now for some numbers (order of magnitude only). Suppose the spacecraft has
  714. an orbital velocity of ~10,000 meters/sec and the geomagnetic field is 
  715. ~10 Gauss. The relevant expression(cgs) is E = V X B / C = 333E-6 statvolt/cm
  716. = 10 Volt/meter = 16,000 Volt/mile of tether. This is pretty close to the 
  717. quoted numbers. The actual orbital velocty is probably closer to 5000m/s.
  718.  
  719. Now lets talk about how the tether might affect the orbit of the satellite.
  720. Imagine a local coordinate system where: V = - |v| \hat{y} ; B = |B| \hat{z}
  721. and the tether is extended in the -x direction. In this cooridnate system,
  722. an equatorial satelite is moving east-to-west (pardon the heresy), the
  723. magnetic field points from the south to the north and the tether is lowered
  724. earthward. The electric field is VXB/c. Therefore it points earthward (-x
  725. direction). E is parallel to J by Ohm's law. The force on the tether is
  726. JXB/c therefore it points in the + y direction. It acts to slow down the
  727. spacecraft. Now the thing to ask is how large. Well that depends on the
  728. resistivity in the tether, since that will determine J. It don't have that
  729. number in my head. Perhaps someone else will comment.
  730.  
  731. |>Conspiracy Theory:
  732. |>------------------
  733. |>The whole thing is Top-Secret high-tech fishing trip: just stick
  734. |>a satellite out on a long string and see if any 'UFO's bite.  ;)
  735.                  
  736. Be careful what you wish for, you may get it. :>
  737.  
  738. john w. cobb
  739. jwc@fusion.ph.utexas.edu
  740.  
  741. ------------------------------
  742.  
  743. End of Space Digest Volume 15 : Issue 076
  744. ------------------------------
  745.